Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/11/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/03/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 09/26/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* UNIT #3 1. GAS PIPING TO BE MINIMUM 3" ABOVE FINISH GRADE AND SHALL BE RIDGID PIPING INTO WEATHERPROOF ENCLOSURE. 2. PROVIDE COUNTER FLASHING FOR VENT THRU ROOF JACK. 3. PROVIDE APPROVED VENT CAP FOR DOUBLE WALL VENT PIPING. UNIT #5 1. PROVIDE APPROVED BASE FOR WATER HEATER 2. GAS PIPING SHALL BE MINIMUM 3" ABOVE FINISH GRADE AND BE RIDGID INTO WEATHERPROOF ENCLOSURE. 3. PROVIDE COUNTER FLASHING FOR VENT THRU ROOF NOT TAPE. 4. PROVIDE APPROVED DOUBLE WALL VENT CAP. REMOVE FLAMMABLE SUBSTANCE FROM ALL VENT PIPING BOTH UNITS. |
|
| 08/08/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |