Inspection History Details
Permit: T06CM04148
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/30/2008 | PLUMBING - FINAL | Not ready for Inspection | 1. EWC PIPING TO BE INSIDE THE COVER 2. T&P RELIEF DRAIN TO BE GRAVITY DRAIN 3. STRAINER IN A FLOOR SINK 4. INSTALL COUNTER SUNK TAPPED CLEANOUT PLUGS AND LEAVE OPEN FOR INSPECTION 5. REMOVE COVER ON EWC INSPECTION STOPPED |
|
| 07/25/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* BACKFLOW CERTS CLEAN BACTERIA REPORT AVB's ON HOSE BIBS CUT DOWN CLEANOUTS PAINT PVC VENT AT LOADING DOCK INSULATE HOT & RETURN PIPING |