Permit: T06CM04096

Parcel: 135042150


Addresses:

1800 S KOLB RD 09


Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Permit Number - T06CM04096

Inspection Description - PLUMBING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
10/19/2006 PLUMBING - INTERMEDIATE Approved IVRS - Inspection :*
REVISED APP. PLAN ON SITE
WATER TEST RESTROOM CENTER SECTION WITH IS DF OK
ADDITION OF 2" DRAINAGE FOR P-7 NEW LOCATION THRU ROOF OK
NOTE: REMOVE DEMO VENT PIPING A+OLD P-7 LOCATION
10/16/2006 PLUMBING - INTERMEDIATE Cancelled CANCELLED PER CONTRACTOR TED OF SABINO CONSTRUCTION
#488-8636
10/16/2006 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELLED
10/09/2006 PLUMBING - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*
INSTALL PER APPROVED PLAN OR PROVIDE REVISED CITY APPROVED PLAN OF INSTALLATION. EXPOSE ALL PIPING FOR INSPECTION. REVENT AT LAV WALL TO BE MINIMUM 6" ABOVE FLOOD RIM OF FIXTURE. ADDITION OF 2" DRAIN FOR SINK IN STORAGE 103 TO HAVE CORRECT TEST FITTING. NO THREADED ABS FITTING SHALL BE ALLOWED IN UNACCESSIBLE LOCATION. PROVIDE MINIMUM 12" COVER FOR SANITARY DRAIN. REMOVE & CAP UNUSED DRAINAGE PIPING AT OLD P-7 & EDF LOCATION AND EXPOSE FOR VIEWING.
NOTE: ANSI STANDARD IS 16"-18" SIDEWALL TO CENTER LINE FOR H/C STOOL.
10/06/2006 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELLED
09/20/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
WATER TEST WASTE & VENT THRU ROOF OK
PER INITIAL ON PLAN
WATER PIPING SAME AREA OK
08/28/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
WATER TEST THRU ROOF IN ART ROOM P-7 & EDF, WATER PIPING SAME OK FOR PLUMBING ONLY.
08/22/2006 PLUMBING - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*
SEE NOTES FROM 8/21/06 INSPECTION. CONTINUED NOT READY'S WILL RESULT IN REFEE
08/21/2006 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1. HAVE BUILDING INSPECTOR SEE CORRECTION TO SUPPORT FOR ROOF STRUCTURE AT LUNCH ROOM.
2. TEST TO BE ON SYSTEM AT TIME OF INSPECTION.
3. VENT FITTINGS TO BE INSTALLED CORRECTLY.