Permit: T06CM04079

Parcel: 133243690


Addresses:

100 N PANTANO RD


Inspection Status: Approved

Inspection History: FIRE - FINAL

Permit Number - T06CM04079

Inspection Description - FIRE - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
08/11/2016 FIRE - FINAL Approved
07/14/2016 FIRE - FINAL Partial Approval Progress inspection. able to stock and train only on Ashley side. No public access allowed.
03/09/2016 FIRE - FINAL Partial Approval "progress inspection"
01/26/2016 FIRE - FINAL Partial Approval Unsure what I was looking for. Did not approve or deny anything. Will discuss with inspector nsprenger.
12/24/2015 FIRE - FINAL Partial Approval North showroom inspected and approved
11/25/2015 FIRE - FINAL Partial Approval they may open for business on the Phase 1 side and have temp C of O.
1.plastic has been removed from wall
2.ceiling tiles are in
3.emergency lighting has been installed
11/24/2015 FIRE - FINAL Partial Approval Wants a TCO for "black Friday" on the Phase 1 portion of this permit.

-Alarm system installed in phase 1 has passed inspection, but reads partial on the alarm permit because the permit covers both phases of the construction.
-Sprinkler overhead for Phase 1 has been approved, but reads partial approval because the permit will remain open until phase 2 has been completed.
MUST COMPLETE BEFORE END OF DAY 11/25/2015 FOR FRIDAYS OPENING:
1. ADD EMERGENCY LIGHTS
2. REMOVE PLASTIC IN ITS ENTIRETY ( ON WALL ON PHASE 2 SIDE OF PROJECT)
3. ALL CEILING TILES MUST BE INSTALLED
03/11/2009 FIRE - FINAL Partial Approval APPROVED STAIRWELL ADDED ON THE EAST SIDE BY LOADING DOCK