Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T06CM04079
Inspection Description - FIRE - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/11/2016 | FIRE - FINAL | Approved | ||
07/14/2016 | FIRE - FINAL | Partial Approval | Progress inspection. able to stock and train only on Ashley side. No public access allowed. | |
03/09/2016 | FIRE - FINAL | Partial Approval | "progress inspection" | |
01/26/2016 | FIRE - FINAL | Partial Approval | Unsure what I was looking for. Did not approve or deny anything. Will discuss with inspector nsprenger. | |
12/24/2015 | FIRE - FINAL | Partial Approval | North showroom inspected and approved | |
11/25/2015 | FIRE - FINAL | Partial Approval | they may open for business on the Phase 1 side and have temp C of O. 1.plastic has been removed from wall 2.ceiling tiles are in 3.emergency lighting has been installed |
|
11/24/2015 | FIRE - FINAL | Partial Approval | Wants a TCO for "black Friday" on the Phase 1 portion of this permit. -Alarm system installed in phase 1 has passed inspection, but reads partial on the alarm permit because the permit covers both phases of the construction. -Sprinkler overhead for Phase 1 has been approved, but reads partial approval because the permit will remain open until phase 2 has been completed. MUST COMPLETE BEFORE END OF DAY 11/25/2015 FOR FRIDAYS OPENING: 1. ADD EMERGENCY LIGHTS 2. REMOVE PLASTIC IN ITS ENTIRETY ( ON WALL ON PHASE 2 SIDE OF PROJECT) 3. ALL CEILING TILES MUST BE INSTALLED |
|
03/11/2009 | FIRE - FINAL | Partial Approval | APPROVED STAIRWELL ADDED ON THE EAST SIDE BY LOADING DOCK |