Permit: T06CM04079

Parcel: 133243690


Addresses:

100 N PANTANO RD

Inspection Status: Partial Approval

Inspection History: FIRE SPKLR - FINAL

Date Description Inspector Results Comments
08/08/2016 FIRE SPKLR - FINAL Partial Approval In room under new facade with 25 foot roof, head blocked by I beam. Need to place another head on side of I beam to have enough coverage. All other heads in concealed spaces within facade have been visualized and approved.
06/06/2016 FIRE SPKLR - FINAL Partial Approval Emergency lights and exit signs are operational / may stock and train only.
06/03/2016 FIRE SPKLR - FINAL Partial Approval two more heads to be dropped in extension of hallway drop ceiling.
submit as builds.
Pending emergency lights / exit lighting passing on Monday 6/6/16,
May stock and train only. No sales to take place until the fire alarm system is fully operative.
11/13/2015 FIRE SPKLR - FINAL Partial Approval 1. Sprinkler system is not properly monitored ( informed by contractor that the flow and tamper was monitored as burgler alarm) - must be monitored by a UL listed company and water flow should trigger a fire alarm response. Need panel indicating alarm, trouble or supervisory and must have a smoke and pull above the panel.
2. may not place merchandise in phase 1 area until all ceiling tiles have been put in place ( unless 24 hour fire watch is provided until all ceiling tiles have been placed).
NS - 11/13/15