Inspection History Details
Inspection Status: Approved
Inspection History: RIGHT OF WAY - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/28/2007 | RIGHT OF WAY - FINAL | Approved | PER EMAIL (NOTE: 1.) driveways built per 1st approved drawings 2.) handrail installed on scupper 3/28/07 | |
| 03/05/2007 | RIGHT OF WAY - FINAL | Denied | PER EMAIL |