Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/15/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 07/28/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* OK TO COVER WALLS SECURE STUB OUTS AT HAND SINK SUPPORT OVERHEAD COPPER CALL FOR INSPECTION FOR CLOSET FLANGES BEFORE SETTING TOILETS. |
|
| 07/20/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. ABS DWV UNDERSLAB OK TO COVER. |
|
| 07/19/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* TWO WAY CLEANOUT FITTING IS NOT LISTED TO BE INSTALLED IN THE VERTICAL POSITION, NOR AS A TEST FITTING. |
|
| 07/18/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. THE PLAN WAS DRAWN AND APPROVED IN ERROR. MAY NOT DISCHARGE A DRAIN INTO A VENT (LAVATORIES). 2. FEMALE ABS THREADED FITTINGS NOT PERMITTED IN INACCESSIBLE LOCATION. |