| 03/14/2008 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 03/12/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* COMPLETE WORK BEFORE CALLING FOR INSPECTION |
|
| 02/15/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 02/15/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* CLOSET FLANGE IN LOBBY RESTROOM OK |
|
| 01/11/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. ADA SHOWERS TEST OK 2. CLOSET FLANGES ON ALL ROOMS OK 3. PER REDLINE DRAWING FOR ROOF DRAINS FOR OVERHEAD OK AND LETTER FROM ENGINEER |
|
| 01/10/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. ADA SHOWERS 1ST & 2ND FLOORS OK THIRD FLOOR #229 OK |
|
| 01/09/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. GAS PIPING TO TIKI BAR PER REDLINE DRAWING ON P502 TEST OK - REDLINES TO BE APPROVED BY CITY OF TUCSON 2. YARDWATER TO TIKI BAR TEST OK 3. PROVIDE TEST ON ADA SHOWERS |
|
| 01/07/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE COMPLETE TEST ON SHOWERS 2. PROVIDE APPROVED DRAWING ON POOL HOUSE |
|
| 01/03/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. TEST ON 1" GAS TO POOL HOUSE TEST OK 2. 1" PEX WATER TO POOL HOUSE TEST OK |
|
| 12/11/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 2ND FLOOR CLOSET FLANGE OK |
|
| 12/10/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 3RD FLOOR AND SOUTH SIDE OF 2ND FLOOR CLOSET FLANGES OK |
|
| 12/07/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 3RD FLOOR FROM SOUTHSIDE TO ROOM #332 |
|
| 12/04/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* CALL BACK FOR YARDWATER |
|
| 11/19/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) INSTALL GAS PIPING PER APPROVED PLANS |
|
| 11/15/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* PROVIDE APPROVED FOR CHANGES FROM COPPER MAIN IN BOILER TO CPVC |
|
| 11/13/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) PIPING AND VENT PIPING FOR ? INTERCEPTOR OK 2) SPA TUB TEST OK 3) TWO NORTH LOBBY ROOF DRAINS OK |
|
| 11/07/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. PROVIDE APPROVED PLANS FOR ROOF DRAIN CHANGES 2. 1ST FLOOR LAUNDRY ROOM WATER PIPING IN WALL TEST OK |
|
| 11/02/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. GAS PIPING IN WALL FOR FINISH KITCHEN ONLY OK TEST 2. UNCOVER WALL WITH PLUMBING TO BE INSPECTED IN WALLS |
|
| 10/26/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. PUBLIC RESTROOM TEST OK IN WALLS 2. KITCHEN AREA OK IN WALLS |
|
| 10/25/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | COMPLETE WORK FROM LAST INSPECTION | |
| 10/23/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE APPROVED DRAIN FOR DISPOSER 2. PROVIDE APPROVED DRAINS FOR SINK 3. COMPLETE WORK IN RESTROOM |
|
| 10/05/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* LAUNDRY AREA DWV WATER TEST THRU ROOF OK UNITS 212, 214 SHOWER WATER TEST OK 1 1/2 HOUR FROM 3RD TO 1ST LEVEL WATER TEST OK |
|
| 10/01/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 2ND LEVEL FROM ELEVATOR SOUTH TUBS & SHOWER WATER TEST ALL EXCEPT UNITS #212 & 214 1. SHALL PROVIDE CORRECT DRAINAGE FOR FLOOR SINKS & FLOOR DRAINS 2ND LEVEL ICE MACHINE FROM 1ST LEVEL 2ND LEVEL ROOMS 204-211, 215-221, WATER TEST THRU LEVEL 3 SAME ROOMS THRU ROOF WATER TEST OK SUPPORT THIS PIPING CORRECTLY LEVEL 1 CEILING SPACE |
|
| 09/26/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* TUB & SHOWER WATER TEST ELEVATOR SHAFT 3RD LEVEL SOUTH ROOM UNITS OK WASTE & VENT WATER TEST ROOM #126, FLOOR SINK SPRINKLER RISER ROOM, MECH ROOM 142 OK ROOM #147 WATER TEST DWV OK |
|
| 09/24/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* UNITS 2ND & 3RD LEVEL FROM ELEVATOR SOUTH #202-224 #304 - 324 WATER TEST THRU ROOF AND WATER DISTRIBUTION IN UNITS ONLY OK |
|
| 09/21/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. REPAIR LEAKS ON ALL PIPING 2. ADD SUPPORT ON ALL PIPING |
|
| 09/17/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. REPAIR LEAK AT ROOM #147, OTHER ROOMS FOR 1ST & 3RD FLOOR TEST OK TO ELEVATOR LOBBY, PROVIDE TEST ON HANDICAP SHOWER ON ALL FLOORS TO BE TESTED AT LATER DATE. |
|
| 09/14/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 2ND FLOOR TUBS FROM NORTH TO ELEVATOR LOBBY |
|
| 09/10/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. GAS PIPING TEST FROM STUB INTO 1ST FLOOR HALL AND STUB THRU ROOF FOR PRV #5 AND #7 OK 2. ROOF DRAINS AND OVERFLOW, RTU#92 TEST OK |
|
| 09/06/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* WATER WASTE & VENT AND WATER FROM NORTHSIDE OF BUILDING TO ELEVATORS LOBBY #200 PER ENGINEER APPROVAL. |
|
| 09/04/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* WATER PIPING IN ROOMS ONLY FROM NORTH SIDE OF BUILDING TO ELEVATOR LOBBY #200 |
|
| 08/30/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. 2ND & 3RD FLOORS WASTE FROM NORTHSIDE TO #353, #327 #253, #227 PER ENGINEER APPROVAL, TEST OK, PROVIDE TEST ON FIRST FLOOR 2. PEX APPROVED BY GERALD M REMBOUSKI IN LIEU OF TYPE L COPPER |
|
| 08/13/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. INSTALL WATER PIPING MATERIAL PER APPROVED PLANS 2. SOLVENT PIPING INSTALL PER APPROVED PLANS |
|
| 06/19/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* READ LIST FROM 6/14/07 INSTALL PER APPROVED PLANS |
|
| 06/14/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) SHALL ? TEST ON ALL PIPING, SHALL INSTALL PER APPROVED PLAN OR HAVE REVISED CITY APPROVED PLAN ON SITE, CORRECT DRAINAGE AND VENT FITTINGS SHALL BE USED. ALL PIPING TO BE CORRECTLY SUPPORTED |
|
| 05/21/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* TEST FROM UNDERGROUND PIPING TO FIRST AERATOR ON FIRST FLOOR OK |