Date Description Inspector Results Comments
10/01/2007 FRAMING Approved IVRS - Inspection :*
09/27/2007 FRAMING Partial Approval IVRS - Inspection :*
1ST FLOOR NORTH OF ELEVATOR
09/25/2007 FRAMING Partial Approval IVRS - Inspection :*
OK TO ROCK TELEDATA 1ST FLOOR
09/21/2007 FRAMING Partial Approval IVRS - Inspection :*
2ND FLOOR FROM ELEVATORS SOUTH -- OK TO ROCK
09/18/2007 FRAMING Partial Approval IVRS - Inspection :*
N 1/2 2ND FLOOR OK TO ROCK
09/13/2007 FRAMING Denied IVRS - Inspection :
See detailed listing on site.| 999*
2ND FLOOR REQUIRES FIREBLOCK
09/11/2007 FRAMING Partial Approval IVRS - Inspection :*
SOUTH OF ELEV 3RD FLOOR (FIRE BLOCK @ CLOSET)
09/06/2007 FRAMING Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. NO P-RINGS IN FIRE PARTITIONS

PLANS CALL FOR 1HR

ARCH. JERRY ROMBOWSKI 330-887-0679
330-620-1449
06/12/2007 FRAMING Not ready for Inspection IVRS - Inspection :*
NOT READY @ FIRE PARTITION FOR ELECTRICAL OUTLETS
05/31/2007 FRAMING Partial Approval IVRS - Inspection :*
MUST CALL FOR INSPECTION PRIOR TO COVERING OR CONCEALING WORK. ANY REQUEST FOR INSPECTION IS THE RESPONSIBILITY OF THE BUILDING PERMIT HOLDERS OR THEIR DUTY AUTHORIZED AGENT. THEY MUST CONTACT BUILDING INSPECTIONS DEPT. WHEN THE WORK IS READY FOR INSPECTION AS WELL AS PROVIDE ACCESS TO THAT PART OF WORK. IT MAY BE NECESSARY TO HAVE MATERIALS REMOVED IN ORDER TO PROVIDE INSPECTION ACCESS OR OBSERVATION FOR A PORTION OF THE BUILDING WORK. THE INSPECTION REGARDING APPROVED JOIST HANGERS CONNECTIONS FOR LB210 WELDING LIPS ON BEAM IN ACCORDANCE WITH SPECIFIC REQUIREMENTS FOR PROPER USE OR LIMITATIONS, SPEC. FOR WELDING LOCATION OR PROVIDE RFI BY ENGINEER.

USB KLB212 HANGERS AND LB210 SIMPSON
05/30/2007 FRAMING Denied IVRS - Inspection :
See detailed listing on site.| 999*
FRAMING INSPECTION SHALL BE MADE AFTER THE ROUGH ELECTRICAL, PLUMBING AND MECHANICAL APPROVALS IN ACCORDANCE WITH THE SEC. 109.3.4