Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/04/2007 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* 1) VACUUM BREAKER REQUIRED AT HOSE BIB 2) CAULK ALL STUCCO MESH PENETRATION 3) CALL FOR FRAME INSPECTION |
|
| 12/29/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROTECT ALL ABS AND WATER LINES WITHIN 1 1/4" OF FRAME MEMBER 10 LB MINIMUM TEST REQUIRED 2) FIRE STOP AT FURR OUT AT EXISTING EAST CMU WALL 3) NEED APPROVED TRUSS DRAWING |