Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/02/2007 | ENGINEERING - FINAL | Approved | ||
| 06/27/2007 | ENGINEERING - FINAL | Denied | NOT READY - COMPLETE ALL CONSTRUCTION OF SITE WORK. 1. PROVIDE A PHASED SITE PLAN THAT IDENTIFIES ALL CONSTRUCTION AND SITE WORK RELATED TO THIS PERMIT. PLAN MUST CLEARLY INDICTE WHAT SITE WORK IS REQUIRED FOR EACH PHASE. 2. RE-STRIPED HANDICAP PARKING AND ACCESSWAYS. 3. PROVIDE BICYCLE PARKING. 4. PROVIDE TRASH ENCLOSURE, 10' X 10' CLEARANCE INSIDE BOLLARDS AS WELL AS GATE. 5. PROVIDE NEW PARKING LOT AND MEMORY GARDEN. NOTE: PLANS/DRAWINGS THAT ARE CROSSED OUT AND CALLED N.I.C. DO NOT IDENTIFY THAT THE CITY OF TUCSON HAS ELIMINATED THESE REQUIREMENTS FROM THE PERMIT. |
|
| 06/20/2007 | ENGINEERING - FINAL | Not ready for Inspection | NOT READY TALKED TO SHAWN SITE SUPER 275-0430 -MOBILE MINI STILL ON SITE -DUMPSTER STILL ON SITE -PORTA TOILETS STILL ON SITE -PARKING AREA NEEDS TO BE SWEPT -ALL CONSTRUCTION MATERIALS AND DEBRIS NEEDS TO BE REMOVED -ALL PEDESTRIAN ACCESS MUST BE USABLE |