Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/31/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/10/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE FACTORY COATED PIPING WITH TOOL MARKS AND FITTINGS UNDERGROUND TO 6" ABOVE GRADE PRIMED THEN TAPED TO MEET 40 MIL THICKNESS 2) PROVIDE AN APPROVED GAS SHUT OFF VALVE AT BLDG 3) PIPING ABOVE GRADE TO BE SUPPORTED AND MINIMUM 3" ABOVE FINISH GRADE 4) INSTALL WATER HEATER 5) PROVIDE BONDING OF BLDG GAS PIPING 6) EXTEND VENT FROM APPLIANCES TO 3' ABOVE TOP OF COOLER INTAKE |