Inspection History Details
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/28/2006 | ROOF NAILING | Approved | IVRS - Inspection :* PROVIDE FLASHING AND WALL ENVELOPE IN SUCH A MANNER AS TO PREVENT ENTRY OF WATER INTO THE WALL CAVITY OR PENETRATION OF WATER TO THE BUILDING STRUCTURAL FRAMING. (PARAPET ABOVE LEDGER) AND PROVIDE THIS ON FRAMING INSPECTION. |
|
| 09/27/2006 | ROOF NAILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* NOTE: PROVIDE ACCESSIBILITY FOR ROOF INSPECTION. RFI INFO -- VERIFY CORRECT NAILING ON ROOF AT LEAST 6" O.C ON EDGES AND FIELD, NOT MORE THAN 1/2" SEPARATION BETWEEN OSB SHEETS. |