Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T06CM03714
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/20/2007 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
05/31/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* PROVIDE TEST ON PIPING |
|
05/15/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 3" VENT FOR GRAY WATER AT NORTHWEST STUBBED UP AND OUT OF BUILDING 2' OK |
|
05/04/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* FROM MANHOLE #3 TO EXISTING MACAQUE HOUSE CONNECTION, TO CONNECTION POINT #29 STUB UP WATER TEST OK. SHALL PROVIDE METAL FOR #29 TERMINATION FROM PAGE C3.0 |
|
05/03/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* WATER TEST 2" EXPANSION OF GRAY WATER DRAIN FOR FUTURE DRINK FOUNTAIN PER REDLINE ON SITE. P-11 TO BE SEEN AS INTERMEDIATE. |
|
05/01/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* MANHOLE #1 VACUUM TEST OK MANHOLE #2 VACUUM TEST OK MANHOLE #3 VACUUM TEST OK 1. SHALL PROVIDE APPROVED DRAINAGE FITTINGS FOR BACK TO BACK P-11'S |
|
04/27/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection : THROUGH BUILDING -- WATER TEST UNDERGROUND SANITARY SYSTEM OK EXCEPT P-11 TO BE TESTED AT LATER DATE. WATER TEST UNDERGROUND GRAY WATER SYSTEM THRU BUILDING TO 2' EXTERIOR OK SHALL SEE GRAY WATER TANKS AND VENT AT LATER DATE. |
|
04/25/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* FROM EXISTING MANHOLE TO NEW MANHOLE #1 AIR TEST OK FROM MANHOLE #1 TO MANHOLE #2 AIR TEST OK FROM MANHOLE #2 TO MANHOLE #3 AIR TEST OK |
|
04/19/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* FROM MANHOLE #3 4" THRU 2-WAY CLEANOUT INTO BUILDING UNDERGROUND APP 5' WATER TEST OK |
|
04/13/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* MANHOLES STACKED OK 1. SHALL PROVIDE PRIVATE MANHOLE COVER LID ON EXISTING PRIVATE MANHOLE TIED INTO ON DOWNSTREAM END. |
|
04/12/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* MANHOLE #2 & #3 BASES POURED |
|
04/09/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) 8" SDR 35 CONTINUES TO MANHOLE #2 AND TO MANHOLE #3 2) 4" SDR 35 STUDS (2) APP 5' OUT OF MANHOLE #3 PER PLAN 3) BEDDING, LAYING, TRACER AND SHADING OK |
|
04/06/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) 8" SDR 35 CONTINUES TO MAN HOLE #2, BEDDING, LAYING TRACER, SHADING AND BACKFILLING OK |
|
04/05/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 8" SDR 35 SEWER CONTINUES WEST APP. 150' WEST OF MH#1 TOWARD MH#2 BEDDING, LAYING, TRACER, SHADING BACKFILLING & MARKER TAPE OK |
|
04/04/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* MANHOLE BASE POURED FOR NEW MANHOLE #1 8" SDR APP 90' WEST TOWARD NEW MANHOLE #2 BEDDING, LAYING, SHADING OK REVISED APPROVED PLAN ON SITE EXISTING MANHOLE NOTE #9 IS PRIVATE |
|
04/02/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* SITE SEWER PRE CONST. MEETING WITH DEAN KG & SONS GARY ADOLFSON PETERSON REVISED PLAN DATED 2/26/07 RUDOLF ANDREW SERVING AS PER REDLINE DUE TO SITE CONDITION. THIS PLAN SHALL BE APPROVED. INSTALLATION TO MEET NOTES ON THIS PLAN WITH TRACER WIRE PER HOUSE BILL 2256 8" SDR PIPING INSTALLED FROM EXISTING (PUBLIC OR PRIVATE MANHOLE?) CONTACTED KEVIN VARNER TO VERIFY THIS AT FUTURE DATE. TO NEW MANHOLE #1 CONTINUES APP 40' UPSTREAM BEDDING, LAYING OK ALL PIPING TO HAVE TEST AT LATER DATE VACUUM TESTING REQUIRED ON MANHOLES VERIFICATION OF GRADE BY ENGINEER OR SURVEYOR FOR PIPING SHALL BE REQUIRED. |