Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/28/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/22/2006 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1) GAS PIPING TO RTU OK 2) PRESSURE TEST OK 3) RECEIVED BACK FLOW CERTS ? 4) W C REQUIRED TO BE SEALED AT CONTACT TO FLOOR 5) SUPPORT SODA DRAIN PIPING WITH PIPE CLAMPS 6) INSTALL ICE MAKER OR REVISE IF DESIRED 7) PROTECT ABS VENT PENETRATION 8) RESTROOMS AND W H SAFETY DEVICES ARE COMPLETE |
|
| 11/02/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* GAS PIPING TO NEW RTU TO BE PER PLAN 1. GAS PIPING TEST SHALL BE HOLDING MINIMUM TEST PRESSURE. 2. SEAL PENETRATION OUT OF BUILDING FOR T&P DRAIN. 3. ALL FIXTURES & APPLIANCES TO BE INSTALLED & HOOK UPS COMPLETED CORRECTLY TO ALL EQUIPMENT. 4. ALL FIXTURES TO BE MADE WATER TIGHT. 5. NO COPPER SHALL BE DOWN STREAM OF CARBONATOR BACKFLOW SUPPLY. 6. ALL CLEANOUTS SHALL HAVE FACTORY TAPPED PLUG WITH MACHINE SCREWS. 7. ALL BACKFLOW CERTIFICATIONS TO BE ON SITE. NOT COMPLETE LIST PROVIDE LISTING FOR WATER HEATER STAND. |