Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/16/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* CLOSET FLANGES OK OTHER CORRECTIONS OK GAS PIPING NOT COMPLETE, CAN BE INSPECTED AT FINAL |
|
| 08/15/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* - ABS DWV W/TEST IS OK - FASTEN CLOSET RING TO THE FLOOR AS REQUIRED BY UPC INSTALLATION STANDARDS. - SUPPORT PEX AT 32" - PROVIDE 18" OF METALLIC PIPING (AT WH) BETWEEN PEX TUBING IN WALL AND SWEAT CONNECTIONS. - REMOVE EXCESS FLUX FROM SOLDIER JOINTS - DON'T FORGET BACKING AT MS - RETEST GAS PIPING AFTER COMPLETING SYSTEM. |