Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T06CM03541
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2007 | ENGINEERING - FINAL | Approved | ALL ISSUES HAVE BEEN ADDRESSED | |
| 02/13/2007 | ENGINEERING - FINAL | Partial Approval | TEMP C OF O APPRVD 12/30/05 BY DROBERTS NO PERM C OF O UNTIL WHOLE SITE IS COMPLETE DRAINAGE AT SE SIDE OF BUILDING IS BEING CHANGED |
|
| 12/06/2006 | ENGINEERING - FINAL | Partial Approval | REINSPECT FOR TEMP C OF O EXTENSION NO FURTHER WORK HAS BEEN DONE |
|
| 11/09/2006 | ENGINEERING - FINAL | Partial Approval | APPROVED FOR TEMP C OF O ONLY PER PAUL MACHADO AND PATRICIA GEHLEN REVISED DEVELOPMENT PLAN AND REVISED GRADING PLAN MUST BE RECEIVED BEFORE THIS PAD CAN BE RELEASED TO FULL C OF O SEE 11/7 COMMENTS |
|
| 11/08/2006 | ENGINEERING - FINAL | Not ready for Inspection | PICTURE FROM 11/07 ADDED | |
| 11/07/2006 | ENGINEERING - FINAL | Not ready for Inspection | PER MTG DOWNTOWN WITH PATRICIA GEHLEN, PAUL MACHADO, DAVE SIROTA: A NEW DEVELOPMENT PLAN WILL BE NEEDED FOR SITE, A NEW GRADING PLAN SHOWING CHANGES TO DRAINAGE SOUTH OF PAD 4 THIS TI CAN BE ISSUED A TEMP C OF O ONLY |
|
| 10/24/2006 | ENGINEERING - FINAL | Not ready for Inspection | TALKED TO BILL POTTER REGARDING C OF O RESEARCH ON PERMIT T05CM00616 PULLED BY RIO WEST FOR SUITE 112. THIS TI ENCOMPASSES BOTH SUITE 118 AND 112. EMAIL TO BETH GRANT. |
|
| 09/05/2006 | ENGINEERING - FINAL | Not ready for Inspection | JADE CONCRETE WASHING OUT TO EAST OF THE BUILDING CALLED BILL POTTER WITH FINA AND ADVISED THAT ALL MUST BE CLEANED UP |
|
| 08/30/2006 | ENGINEERING - FINAL | Not ready for Inspection | TALKED TO BILL POTTER WITH FINA LEFT MESSAGE FOR BILL HUFF WITH FINA WORK NOT STARTED YET-FRAZEE PAINT MADE BILL POTTER AWARE THAT TEMP C OF O ONLY UNTIL SHELL IS FINALED/SITE WORK COMPLETE |