Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T06CM03539
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/15/2006 | ELECTRIC - FINAL | Approved | ||
09/12/2006 | ELECTRIC - FINAL | Partial Approval | JERRY MARTIN 591-2019 CHECK FOR $108.00 RECEIVED AC NORTH UNIT 1. STRAP FLEX 2. FIX DISCONNECT COVER SO IT CLOSES AC SOUTH UNIT 1. MAX 50 AMP FUSE INSIDE 1. PROVIDE DISCONNECTION MEANS PER NEC 2002 422.31(B) FOR BATHROOM INSTA HOT. 2. PANEL DIRECTORY NOT CORRECTLY IDENTIFIED - NEC 408.4 3. HAVE LOOSE DEVICES AND BOXES IN WALLS -- NEC 406.4 & 314.23 OK TO OCCUPY |
|
09/08/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. POWER NEEDS TO BE ON BEFORE FINAL INSPECTION. 2. CEILING TILES HAVE NOT BEEN APPROVED TO BE INSTALLED AND MUST BE REMOVED PRIOR TO FINAL INSPECTION. 3. ENTRY LIGHTING THAT IS COVERED IN WALL MUST EITHER BE REMOVED OR EXPOSE J-BOXES FOR LIGHTS AND INSTALL LIGHTS OR BLANK COVERS. |
|
09/07/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* SERVICE INSPECTION ONLY #4 BOND SERVICE RACEWAY INTO METER AND METER TO DISCONNECT IDENTIFY SERVICE DISCONNECTS. DO NOT CALL FOR FINAL UNTIL ENERGIZED |