Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2006 | FRAMING | Approved | IVRS - Inspection :* | |
| 08/15/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) H20 TEST DWV TO GO THROUGH ROOF 2) INSTALL POSITIVE ATTACHMENT PORCH LEDGER TO STUDS SHEARWALLS, HOLDOWNS INCOMPLETE 3) INSTALL BANG PLATES, PLUMBING AND ELECTRIC THROUGHOUT 4) TIGHTEN NUTS HOLDOWNS 5) COMPLETE LATHE 6) STOPPED INSPECTION |
|
| 08/11/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO TEST DWV POTABLE H20 2) HOLDOWNS MISSING BOLTS 3) LATHE INCOMPLETE 4) NO PLANS/PERMIT VISIBLE 5) STOPPED INSPECTION 6) REFEE DUE |
|
| 08/10/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) INCOMPLETE 2) STOPPED INSPECTION 3) NO PLANS/PERMIT |
|
| 08/09/2006 | FRAMING | Not ready for Inspection | IVRS - Inspection :* |