Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T06CM03521

Parcel: 116020180

Inspection Status: Approved

Inspection History: BUILDING - FINAL

Permit Number - T06CM03521

Inspection Description - BUILDING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
02/20/2007 BUILDING - FINAL Approved IVRS - Inspection :*
02/09/2007 BUILDING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) GFCI BATH INOPERATIVE
2) INSTALL DRAIN PAN UNDER H20 HEATER, SIZED AND DRAINED ACCORDINGLY
3) CUT SEWER CLEANOUTS TO GRADE
4) ELECTRIC H20 HEATER HAS SEPERATE FUSED DISONNECT-CANNOT LOCATE
02/05/2007 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
1) CANCELLED PER CONTRACTOR
01/10/2007 BUILDING - FINAL Partial Approval IVRS - Inspection :*
1) SEAL BASE OF TOILET
2) INCORRECT MATERIAL FOR H20 HEATER PTR LINE REVERSE FLOW SINK DRAIN
3) NEED H20 HEATER INSTALLATION SPECS
4) NEED GFCI RECEPTACLE BATH