Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2006 | ENGINEERING - FINAL | Approved | Contractor completed punch list. | |
| 12/14/2006 | ENGINEERING - FINAL | Denied | ALL DISTURBED AREAS MUST BE STABILIZED ALL PAINT/DRYWALL WASHOUT MUST BE CLEANED UP (NE OF TRASH ENCLOSURE) ALL CONSTRUCTION DEBRIS MUST BE REMOVED (BOLLARD, BROOM PARTS, TEMP BARRICADE, ETC) |