Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 12/14/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SHALL PROVIDE DIELECTRIC PROTECTIONFOR DISSIMILAR MATERIALS. AT WATER TAKE OFFS AT WATER HEATER AREA 2. SHALL SUPPORT WATER HEATER EXPANSION TANK. 3. WATER HEATER TEMPERATURE & PRESSURE RELIEF TO HAVE FULL SIZE APPROVED MATERIAL FOR DRAIN TO DAYLIGHT. |
|
| 12/07/2006 | PLUMBING - FINAL | Not ready for Inspection | SHALL SEE SINK INSTALL WITH AIR ADMITTANCE VALVE IN REAR OFFICE. BACKFLOW CERTIFICATIONS TURNED IN. | |
| 11/07/2006 | PLUMBING - FINAL | Partial Approval | 1. SHALL PROVIDE SEPARATE DRAINS FOR 009'S OR UP SIZE TO ACCOMODATE FULL FLOW FROM ALL DEVICES MANIFOLDED TOGETHER. 2. SHALL BE NOT COPPER OR BRASS PIPING DOWNSTREAM OF 009'S SERVING CARBONATORS. ADDRESS THIS IMMEDIATELY! |