Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/06/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* REDLINE ON SITE OF 2" WASTE FOR HANDSINK |
|
| 12/05/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* SEE NOTE #2 FROM 11/24/06 INSPECTION AND PROVIDE AS REQUESTED REDLINE ON SITE. OTHER CORRECTIONS ARE MADE WATER TEST ON EXTERIOR PIPING IS OK |
|
| 11/24/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. YOUR CONNECTION TO EXISTING LOCATION IS BACK-PITCHED AND SHALL BE CORRECTED AT EXISTING LOCATION. 2. PROVIDE MINIMUM REDLINE ON SITE WITH APPROVED PLAN TO FOLLOW FOR ACTUAL SINK DRAINAGE. |
|
| 11/21/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PROVIDE CORRECT LONG RADIUS DRAINAGE FITTING FOR HORIZONTAL CHANGE OF DIRECTION. PROVIDE CORRECT CLEANOUT FITTING AT BUILDING (TAP SANTEE ON BACK IS NOT). PROVIDE CORRECT TRANSITION COUPLINGS AT 4" SEWER CONNECTION WITH FITTING INSTALLED WITH MINIMUM 1/8" PER FOOT FALL IN DIRECTION OF FLOW. |
|
| 11/06/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 2" SANITARY DRAINAGE TO EAST BUILDING EXTERIOR UP WITH VENT TO 10' AFF FOR HAND SINK WATER TEST OK 1. SHALL PROVIDE PIPE WRAP AT PENETRATION UP THRU CONCRETE FLOOR. 2. SHALL PROVIDE TEST ON CONTINUATION OF BUILDING 2" DRAINAGE FROM EAST EXTERIOR TO EXISTING BUILDING SEWER. |