Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/08/2007 | ENGINEERING - FINAL | Approved | ||
| 01/08/2007 | ENGINEERING - FINAL | Denied | NOT READY FOR INSPECTION 1. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. 2. SWEEP AND PATCH ASPHALT PAVEMENT. 3. STABILIZE DISTURBED SOIL. |