Permit: T06CM03296

Parcel: 10321341A


Addresses:

2140 W GRANT RD


Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Permit Number - T06CM03296

Inspection Description - PLUMBING - ROUGH, SOIL

Inspection Status - Approved

Date Description Inspector Results Comments
03/13/2007 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
1. 4" PVC CHASE FOR 1/2" TYPE "L" HELIUM LINE TO FLORAL KIOSK - OK 1/2" COPPER HELIUM SUPPLY OK
2. INSULATED HOT & COLD DOMESTIC TO KIOSK OK
3. 4" CWV WITH 3" VENT AND 4" C.O FOR FLOOR SINK OK
OK TO COVER
4. IN FLORAL, 3 FLOOR SINKS TIED INTO CWV SYSTEM OK
1/2" COPPER LOOPED TO EXTERIOR WALL OK
03/02/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1. ABS DWV UNDER SLAB FOR NEW BATHROOM GROUPS OK TO COVER
WATER TEST ONE RISER TO TEN FEET OK
02/15/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
STARBUCKS
WATER TEST ADDITION OF DRAINAGE (2) 2" FOR SINKS WITH LOOP VENTS INSTALLED TO 2' AFF PER PLAN AT SOUTH LOCATION.
NOTE: CLEANOUTS ARE REQUIRED AT THIS SOUTH LOCATION FOR VENTS FOR INTERMEDIATE
(3) FLOOR SINKS REWORKED FOR EAST SIDE OF FREEZER CASE OK
MY INITIAL ON P.1.2
02/14/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
AFTER HOURS INSPECTION CHECK #5614348763
1. (3) FLOOR SINKS ON WEST SIDE OF FREEZER CASE OK
2. 2" DRAIN FOR PHARMACY SINK WATER TEST UNDERGROUND ONLY OK.
3. (3) FLOOR SINKS FS-1 IN STARBUCKS UNDERGROUND WATER TEST OK INCLUDING 3" VENT AT SOUTH SECTION
TO 2" AFF

3/4" HOT & COLD UNDER SLAB IN STARBUCKS WITH 1/2 COLD LOOPED TO R.O SYSTEM AREA AIR TEST OK
02/14/2007 PLUMBING - ROUGH, SOIL Not ready for Inspection UNABLE TO LOCATE PLUMBER
NOBODY IN OFFICE
02/07/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) LEFT GAS CARD
2) UNDERGROUND IN PRODUCE OK TO COVER
3) TRENCH DRAIN AT DAIRY WALK IN BOX OK
01/24/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1. VENT AT CASEWORK FOR CWV THRU ROOF OK
2. OVERHEAD PIPE AT BAKERY INCLUDING GAS PIPE OK
3. GAS PRESSURE TEST AT BAKERY OK. ANSUL OK.
4. UNDERGROUND A UNISEX BATHROOM, JANITOR ROOM AND F.S FOR CONDENSATE.
01/11/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
THIS INSPECTION FOR 2" CW RE-ROUTE FROM NEW METER
AT NORTHEAST CORNER THRU TO EXISTING PER REDLINE
ON P1.2& P1.7
01/08/2007 PLUMBING - ROUGH, SOIL Partial Approval
12/18/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
PLUMBING WALL IN MEAT DEPT. AT COOLER (EXPOSED) OK
SUBJECT TO SPEC'S
COPPER WATER SERVICE OK TO COVER
12/13/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
11/28/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
ROUGH PIPING FOR MEAT BOX TD, VENT OFFSET AND FS RELOCATE OK
11/15/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
PRE-POUR FOR FLOOR SINKS, AND FRANK PATTERN C.O
COVERS OK TO POUR.
11/06/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
4" CWV FOR STARBUCKS FROM DELI
OK TO COVER
11/02/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) CWV THRU MEAT PREP AREA, EXCLUDING THROUGH DRAIN WHICH IS INCLUDED ON P1.2A REVISION
2) SANITARY SEWER IN MEAT BOX OK TO COVER
3) CONNECTION OF CWV ALONG COLUMN AC4 OK TO COVER
11/01/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
GREASE WASTE AS INITIATED ON PLAN OK TO COVER
CWV AS INITIALED ON PLAN OK TO COVER
10/26/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
COMBINATION WASTE & VENT FROM DELI AREA (COL 5) TO BACKWALL OF STORE (COL 2.1) AND BETWEEN AD AND AC
OK TO COVER
10/25/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
10/19/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
4" ABS DRAIN, EXTENDED FROM COLUMN "D" TO TIE IN AT EXISTING PER REDLINES.

THIS AREA INCLUDING CWV SYSTEM SUBJECT TO REVISED PLAN.
10/17/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1. AS BUILT CONDITIONS REQUIRE REDLINED CHANGES TO THE PLAN. REDLINES ON P1.2
2. FLOOR SINKS ALONG COLUMN "D" TO THE END OF THE CASE
APPROX. 2.5 COLUMN
3. OK TO COVER SUBJECT TO PLAN APPROVAL.
4. SEWER FROM INTERCEPTOR TO TIE IN AT EXISTING OK TO COVER.
10/15/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1. INTERCEPTOR SET
2. INLET AND OUTLET IS ABS
VENT BACK TO INSIDE
WATER TEST OK

OK TO COVER SUBJECT TO APPROVAL OF MAT'L TYPE.