Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T06CM03296
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2007 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1. 4" PVC CHASE FOR 1/2" TYPE "L" HELIUM LINE TO FLORAL KIOSK - OK 1/2" COPPER HELIUM SUPPLY OK 2. INSULATED HOT & COLD DOMESTIC TO KIOSK OK 3. 4" CWV WITH 3" VENT AND 4" C.O FOR FLOOR SINK OK OK TO COVER 4. IN FLORAL, 3 FLOOR SINKS TIED INTO CWV SYSTEM OK 1/2" COPPER LOOPED TO EXTERIOR WALL OK |
|
| 03/02/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. ABS DWV UNDER SLAB FOR NEW BATHROOM GROUPS OK TO COVER WATER TEST ONE RISER TO TEN FEET OK |
|
| 02/15/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* STARBUCKS WATER TEST ADDITION OF DRAINAGE (2) 2" FOR SINKS WITH LOOP VENTS INSTALLED TO 2' AFF PER PLAN AT SOUTH LOCATION. NOTE: CLEANOUTS ARE REQUIRED AT THIS SOUTH LOCATION FOR VENTS FOR INTERMEDIATE (3) FLOOR SINKS REWORKED FOR EAST SIDE OF FREEZER CASE OK MY INITIAL ON P.1.2 |
|
| 02/14/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* AFTER HOURS INSPECTION CHECK #5614348763 1. (3) FLOOR SINKS ON WEST SIDE OF FREEZER CASE OK 2. 2" DRAIN FOR PHARMACY SINK WATER TEST UNDERGROUND ONLY OK. 3. (3) FLOOR SINKS FS-1 IN STARBUCKS UNDERGROUND WATER TEST OK INCLUDING 3" VENT AT SOUTH SECTION TO 2" AFF 3/4" HOT & COLD UNDER SLAB IN STARBUCKS WITH 1/2 COLD LOOPED TO R.O SYSTEM AREA AIR TEST OK |
|
| 02/14/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | UNABLE TO LOCATE PLUMBER NOBODY IN OFFICE |
|
| 02/07/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) LEFT GAS CARD 2) UNDERGROUND IN PRODUCE OK TO COVER 3) TRENCH DRAIN AT DAIRY WALK IN BOX OK |
|
| 01/24/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. VENT AT CASEWORK FOR CWV THRU ROOF OK 2. OVERHEAD PIPE AT BAKERY INCLUDING GAS PIPE OK 3. GAS PRESSURE TEST AT BAKERY OK. ANSUL OK. 4. UNDERGROUND A UNISEX BATHROOM, JANITOR ROOM AND F.S FOR CONDENSATE. |
|
| 01/11/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* THIS INSPECTION FOR 2" CW RE-ROUTE FROM NEW METER AT NORTHEAST CORNER THRU TO EXISTING PER REDLINE ON P1.2& P1.7 |
|
| 01/08/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | ||
| 12/18/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* PLUMBING WALL IN MEAT DEPT. AT COOLER (EXPOSED) OK SUBJECT TO SPEC'S COPPER WATER SERVICE OK TO COVER |
|
| 12/13/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 11/28/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* ROUGH PIPING FOR MEAT BOX TD, VENT OFFSET AND FS RELOCATE OK |
|
| 11/15/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* PRE-POUR FOR FLOOR SINKS, AND FRANK PATTERN C.O COVERS OK TO POUR. |
|
| 11/06/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 4" CWV FOR STARBUCKS FROM DELI OK TO COVER |
|
| 11/02/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) CWV THRU MEAT PREP AREA, EXCLUDING THROUGH DRAIN WHICH IS INCLUDED ON P1.2A REVISION 2) SANITARY SEWER IN MEAT BOX OK TO COVER 3) CONNECTION OF CWV ALONG COLUMN AC4 OK TO COVER |
|
| 11/01/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* GREASE WASTE AS INITIATED ON PLAN OK TO COVER CWV AS INITIALED ON PLAN OK TO COVER |
|
| 10/26/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* COMBINATION WASTE & VENT FROM DELI AREA (COL 5) TO BACKWALL OF STORE (COL 2.1) AND BETWEEN AD AND AC OK TO COVER |
|
| 10/25/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 10/19/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 4" ABS DRAIN, EXTENDED FROM COLUMN "D" TO TIE IN AT EXISTING PER REDLINES. THIS AREA INCLUDING CWV SYSTEM SUBJECT TO REVISED PLAN. |
|
| 10/17/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. AS BUILT CONDITIONS REQUIRE REDLINED CHANGES TO THE PLAN. REDLINES ON P1.2 2. FLOOR SINKS ALONG COLUMN "D" TO THE END OF THE CASE APPROX. 2.5 COLUMN 3. OK TO COVER SUBJECT TO PLAN APPROVAL. 4. SEWER FROM INTERCEPTOR TO TIE IN AT EXISTING OK TO COVER. |
|
| 10/15/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. INTERCEPTOR SET 2. INLET AND OUTLET IS ABS VENT BACK TO INSIDE WATER TEST OK OK TO COVER SUBJECT TO APPROVAL OF MAT'L TYPE. |