Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T06CM03296
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/04/2008 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 08/01/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* CANCELED |
|
| 07/10/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* FINISH VDV CABLING PER 725.6 AND 300.11 |
|
| 07/08/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* CALLED PH# PER REQUEST, LEFT MESSAGE, RECALL INSPECTION, COULD NOT LOCATE CONTR. ON SITE. |
|
| 06/19/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 06/10/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PARTIAL INSPECTION ONLY 1. POST LABELS AT PANELS PER NEC 200.6D & 210.5C 2. NEED PLAN REVIEW FOR ENCLOSED ROOM BUILT ABOVE CEILING FOR BREAK ROOM. PLAN TO SHOW EQUIPMENT AS IT IS INSTALLED. EQUIPMENT CLEARANCES TO BE PER NEC 110.26 ALSO, REMOVE PAINT UNDER LUGS, DO NOT STACK LUGS. 3. ALL LOW VOLTAGE WIRING IN CEILINGS TO BE PROPERLY SUPPORTED TO STRUCTURE, NOT TO LAY ON GRID OR OTHER EQUIPMENT 4. CHECK/RETYPE PANEL DIRECTORIES SF & R3 - ABBREVIATIONS NOT ALLOWED/GO TO WHAT IS SAYS |
|
| 06/04/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* INSPECTION FOR UPS INSTALLATION - PARTIAL INSPECTION ONLY 1. PLAN SHOWS U.P.S MOUNTED 10' AFF RIGHT NOW IT IS BLOCKING ACCESS TO EQUIPMENT 2. THIS IS NOT A UPS SIZE SHOWN ON PLANS - NOT WIRED PER PLAN 3. DISCONNECTS & SWITCHES FOR UPS TO BE MAX. 6'7" TO SWITCHES ABOVE FLOOR (IN UP/ON POSITION) 4. A SIGN IS REQUIRED AT SERVICE FOR UPS AND GENERATOR SEE NEC 700.8 5. OVERCURRENT PROTECTION NOT CORRECTLY SIZED 6. NEED BUSHINGS FOR FITTING WITH #4 & LARGER CONDUCTORS 7. IDENTIFY ALL DISCONNECTS 8. CORDS NOT TO TAKE THE PLACE OF PERMANENT WIRING METHODS. 9. 2 GROUNDS NOT ALLOWED UNDER SAME LUG IN J-BOX |
|
| 06/03/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 04/14/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* WIRING TO BE DONE PER PLAN AND PER CODE, ELECTRICAL CONTRACTOR TO GO THROUGH ENTIRE INSTALLATION BEFORE CALLING FOR FINAL. ALSO, MAKE SURE ALL PREVIOUS CORRECTIONS COMPLETE |
|
| 04/09/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 10/01/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* NO INSPECTION AT THIS TIME 1. WORK NOT PER APPROVED PLAN - REVISE PLAN AND GET PLAN REVIEW APPROVAL 2. ELECTRICIAN WILL BE REQUIRED FOR INSPECTIONS TO OPEN EQUIPMENT 3. WILL NEED INSTALLATION MANUAL FOR GENERATOR 4. WHEN YOU HAVE APPROVED PLANS, HAVE ELECTRICAL CONTRACTOR GO THROUGH WORK AND MAKE SURE INSTALLATION IS PER PLAN AND PER CODE, THEN CALL FOR FINALS. |
|
| 09/24/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 09/20/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 08/27/2007 | ELECTRIC - FINAL | Cancelled | CANCELLED PER BEN OF HAUGEBAK CONST. #955-3809 | |
| 08/27/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* CANCELLED BY CONTRACTOR |
|
| 06/11/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* NO INSPECTION AT THIS TIME ALL WORK AND PREVIOUS CORRECTIONS TO BE COMPLETE BEFORE A FINAL INSPECTION IS CALLED IN. |
|
| 02/21/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 02/20/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* INSPECTION FOR MAIN SALES AREA OF ADDITION, INTERIOR ONLY 1. INSTALL PANEL DIRECTORY FOR PANELS "DA & DB" OK TO OCCUPY ADDITION AREA - EXTERIOR EGRESS LIGHTING NOT COMPLETE. THERE WILL BE NO FINAL APPROVALS UNTIL ELECTRICAL WORK IS COMPLETE. THIS IS A PARTIAL INSPECTION ONLY AND ALL AREAS WILL BE SUBJECT TO INSPECTION ON ELECTRICAL FINAL. |
|
| 02/16/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* OK TO COVER UNDERGROUND FOR STARBUCKS AREA AND IN CLOSET WALL |
|
| 02/15/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* CALL FOR FINAL WHEN COMPLETE ADDITION NOT TO BE OCCUPIED PRIOR TO APPROVAL BY THE BUILDING OFFICIAL FOR THE CITY OF TUCSON. |
|
| 02/08/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) INSPECTION FOR TCO FOR ADDITION 2) THIS AREA IS NOT READY FOR TCO INSPECTION |
|
| 12/29/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) OK TU USE MEAT PREP AREA-THIS AREA WILL BE SUBJECT TO INSPECTION AT FINAL |