Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/20/2006 | PLUMBING - FINAL | Approved | ||
| 09/19/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. COMPLETE PLUMBING WORK PER PLAN. PROVIDE CORRECT TRANSITION COUPLING FOR ABS TO CAST IRON AT FLOOR SINK. 2. PROVIDE VENT FOR FLOOR SINK THAT IS ADDED WITH MINIMUM RUN TEST AT TIME OF INSPECTION. 3. CORRECTLY SUPPORT ALL PIPING & DEVICES 4. BACKFLOW DEVICES ARE REQUIRED FOR EACH DEVICE WITH DIRECT WATER CONNECTION WHERE OTHER SUBSTANCES ARE MIXED WITH WATER. SHALL BE MOUNTED 5' FROM FINISH FLOOR IN SERVICEABLE LOCATION. ICE MACHINE, ESPRESSO, COFFEE, SODA DISPENSER, HOT CHOCOLATE, ETC. 5. INDIRECT DRAINAGE TO BE DIRECTLY TRAPPED IF OVER 5' TRAPPED & VENT IF OVER 15'. WITH MINIMUM 1/4" PER FOOT FALL. 6. PROVIDE CERTIFICATIONS FOR ALL IN HOUSE DEVICES. 7. PEX TO BE INSTALLED CORRECTLY WITHOUT KINKS PER INSTALLATION MANUAL. 8. PROVIDE VACUUM BREAKERS AT HOSE BIBBS. 9. PROVIDE 1" AIR GAP AT ALL DRAINS AT MOP SINK & FLOOR SINKS. |