Permit: T06CM03171

Parcel: 12218256C


Addresses:

3701 E SPEEDWAY BL

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
02/14/2008 PLUMBING - FINAL Approved IVRS - Inspection :*
02/01/2008 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
- PLAN REV. IS NOT APPROVED
- OPTION IS TO ADDRESS ALL PLAN SPECS FROM APPROVED PLAN WITH A LETTER FROM ARCHITECT
- CORRECT PIPE SIZE AT TOILET RM BRANCH
- INSTALL HB VAC BREAKER
12/31/2007 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
- READ AND COMPLETE PREVIOUSLY NOTED ITEMS
- WATER PIPING NOT PER PLAN, INSTALL FULL SIZE TO BATHROOM CONNECTION.
- INSTALL ISOLATION VALVES PER PLAN.
- ADDRESS ALL CHANGES FROM PLAN SPECS INCLUDING RP TYPE, HB TYPE, LAV FAUCETS THERMOMETER.
- AT WH ROUTE TUBING BEHIND LADDER AND INSULATE 8' ON HW & CW.
- TOILETS NOT CAULKED, LAVS MISSING MIXING VALVES
- HB VAC B MISSING
- REMOVE EXISTING RP PER PLAN, CAP, PROPERLY CONNECT OR ELIMINATE IRR. ASSEM. CERTIFY
- FS MISSING GRATE
- BACKWATER VALVE NOT ACCESSIBLE OR NOT INSTALLED
- PROVIDE PLAN REVISION OR LETTER FROM ARCHITECT
12/28/2007 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
OK TO COVER WATER LINE IN EASEMENT
05/09/2007 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. WATER PIPING NOT PER PLAN.
2. HBS NOT PER PLAN AND MISSING VACUUM BREAKERS.
3. SEVERAL ITEMS ARE MISSING OR NOT PER PLAN
READ FIXTURE SCHEDULE AND PLUMBING NOTES.
4. EXAMPLES ARE VALVES, TRAP PRIMER, HEAT TRAPS, INSULATION. ALSO, MISSING LAV TEMPERING VALVES.
5. CORRECT MOP SINK WASTE CONNECTION.
6. REMOVE WCS FOR FLANGE FASTENER INSPECTION AND CALL FOR INTERMEDIATE INSPECTION.
04/18/2007 PLUMBING - FINAL Partial Approval IVRS - Inspection :*
04/18/2007 PLUMBING - FINAL Partial Approval OFFICE & WAITING ROOMS #100, 101 & 102 HAVE NO PLUMBING PROBLEMS THAT WOULD PREVENT A TCO ALL PIPING IS TEMPORARILY CAPPED. RESTOOMS NOT COMPLETE. CLOSET FLANGES HAVE NOT BEEN SECURED AS REQUIRED