Permit: T06CM03121

Parcel: 13331159Y


Addresses:

8740 E BROADWAY BL


Inspection Status: Denied

Inspection History: ELECTRIC - FINAL

Permit Number - T06CM03121

Inspection Description - ELECTRIC - FINAL

Inspection Status - Denied

Date Description Inspector Results Comments
07/07/2008 ELECTRIC - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
HAVE ELECTRICAL CONTRACTOR GO THROUGH ENTIRE STORE ENSURE JOB IS 100% COMPLETE PER APPROVED PLANS AND MEETS NEC REQUIREMENTS
04/04/2007 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
MEAT DEPT INSPECTION ONLY
1. NEED REVISION TO DRAWING SHOWING ALL WORK
2. NEED TO INSTALL WEATHERPROOF RECEPT PER DRAWINGS
3. REMOVE ALL OLD ELECTRIC & DEBRIS FROM CEILING ABOVE MEAT DEPT.
4. SEAL ALL OPEN JUNCTION BOXES & MISSING KNOCKOUTS
5. CANNOT USE SJ CORD FOR PERMANENT WIRING OF BUILDING. SPOT COOLER.
6. NEED TO INSTALL DISCONNECT FOR ALL APPLIANCES PER NEC 422
7. NEED TO INSPECT CEILING ABOVE MEAT COUNTER. HAVE NO ACCESS TO JUNCTION BOXES AT LIGHT FIXTURES ALL DROP CEILING PANELS HAVE ITEMS IN THEM.
8. COMPLETE ALL ITEMS IN BAKERY AREA.
01/18/2007 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
1. DEMO BACK TO JUNCTION BOXES AND FILL UNUSED OPENINGS FITTINGS UNUSED DO NOT FILL - NO EXPOSED CONDUCTORS.
2. FINISH VDV STORE
3. FINISH LIGHTS BAKERS & GFCI'S
4. SUPPORT WIRES NEEDED FIXTURES - BACK OF STORE
5. WE HAVE EXPOSED CONDUCTORS IN COMBUSTIBLE MATERIAL - USE APPROVED BOXES AND CABLES
OK DELI
OK EM LIGHTING

RECEIVED MONEY ORDERS: 55871576453 & 55871576454
01/17/2007 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
1. FINISH PREVIOUS INSPECTION 1, 6 & 7 DELI

* CHECK DELI & BAKERY NEXT TIME - GO THROUGH BAKERY BEFORE NEXT INSPECTION
01/11/2007 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
DELI
1. BOXES MORE THAN 1/4" FROM BOX TO SURFACE AT NON-COMBUSTIBLES OR FLUSH AT COMBUSTIBLES NEED AN APPROVED EXTENDER RING -- 314.20
2. KITCHEN RECEPTACLE TO BE AS PER 210.8 - GFCI OR SINGLE
3. GFI AT COUNTER NOT WORKING
4. FILL UNUSED OPENINGS IN BOXES
5. SUPPORT M/C CABLE AS PER CODES
6. VDV CABELING TO BE AS PER 725.3 & 6, 800.3 & 6
7. ATTACH FIXTURES TO GRID
01/04/2007 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
1. NEED PLAN REVISIONS
A. UNDERGROUNDS
B. PANEL SCHEDULES
C. LIGHTING LOAD CALCULATIONS
AND FIXTURE SCHEDULES

2. INSPECTIONS WILL BE PERFORMED IN AREAS
ACCESS TO CEILINGS AND DEVICES WILL NEED TO BE ACCOMODATED.

OK STARBUCK FINAL SUBJECT TO REVISIONS.
12/21/2006 ELECTRIC - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
NO ONE ON SITE
NO PLANS
NO MESSAGE
NO DIRECTIONS
TO MANAGER - PLEASE HAVE CONTRACTOR RECALL FOR INSPECTION AND HAVE PLANS HERE IN ORDER TO GO OVER FINAL.
08/15/2006 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
1. NOTE ALL REVISIONS NEED TO GO THROUGH ORIGINAL PLAN REVIEWER (STANTEC) HAVE THE STAMPED APPROVED REVISION ON JOB SITE APPROVED BY CITY OF TUCSON - STANTEC.
2. INSTALL PROTECTIVE BUSHING ON 1 1/4" FLEX CONNECTOR IN PANEL FEEDING PANEL.
3. REVISE PANEL SCHEDULE SE & LOADS TO REFLECT ADDED EQUIP. & RELOCATED CIRCUITS.