Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/06/2006 | ENGINEERING - FINAL | Approved | ||
| 10/11/2006 | ENGINEERING - FINAL | Denied | 1. PATCH ASPHALT NORTH OF BUILDING. 2. CLEAN UP AND REMOVE CONSTRUCTION MATERIAL AND DEBRIS. 3. COMPACT SOIL IN UTILITY TRENCH NORTH OF BUILDING. 4. REPAIR EROSION DAMAGE AT SPILLWAY INTO THE RETENTION/DETENTION BASIN. 5. CORRECT TRIP HAZARD AT SEWER CLEANOUT IN SIDEWALK NORTH OF BUILDING. |