Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2006 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
| 11/01/2006 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) HOLDOWNS NOT PER PLAN 2) NAIL LEDGERS TO SHEAR BLOCKS PER PLAN 3) DBL JOISTS REQUIRED UNDER MECH, PER PLAN 4) BLOCK EDGE JOINTS OF ROOF SHEATHING LESS THAN 24" WIDE 5) BLOCK JOINTS IN ROOF SHEATHING AT CRICKETS |
|
| 10/26/2006 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PAHD42 HOLDOWNS ARE NOT ON APPROVED PLAN 2) NAIL SHEAR PANELS AT 8' BREAK 3) NAIL LEDGER TO BLOCKS AT SHEAR PANELS PER PLAN 4) VERIFY LOCATION OF HEAT PUMP-DBL JOISTS MAY BE REQUIRED 5) CLIP EXTERIOR STUDS MINIMUM 32" 6) STRAP PORCH BEAMS TO INTERIOR POSTS 7) LAG BOLT THROUGH PORCH BEAM TO VIGA POST BELOW NOT VISIBLE 8) PROVIDE LADDER 9) FINAL FRAME INSPECTION WILL OCCUR AFTER COMPLETION OF ALL TRADES |