Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T06CM03070
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/12/2006 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
07/11/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. CORRECTLY IDENTIFY ALL CKTS ON PANEL DIRECTORY AND REPLACE CRACKED BREAKER. BATHROOM CORRECTIONS OK |
|
07/07/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : There is no access to the site.| 920* UNIT IS LOCKED |
|
07/06/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. ELECTRICAL IS NOT PER PLAN. 2. PROVIDE ACCESS TO BATH LIGHT, RECEPT, SWITCH J-BOX 3. LIGHT J-BOX NOT GROUNDED AND HAS OPEN HOLE. 4. WRAP EQUIPMENT GROUND ALL THE WAY AROUND GROUND SCREWS. 5. BATHROOM CKT IS DEAD/TRIPPED 6. INSTALL ALL FACE PLATES. |
|
07/05/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. ALL WORK NEEDS TO BE DONE BY A LICENSED ELECTRICAL CONTRACTOR. 2. WORK NOT DONE PER PLAN. 3. RECEPTACLES NOT INSTALLED. |