Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CONSTRUCTION POWER
Permit Number - T06CM03032
Inspection Description - ELECTRIC - CONSTRUCTION POWER
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/06/2007 | ELECTRIC - CONSTRUCTION POWER | Approved | IVRS - Inspection :* | |
07/06/2007 | ELECTRIC - CONSTRUCTION POWER | Denied | IVRS - Inspection : See detailed listing on site.| 999* PARTIAL INSPECTION ONLY 1. NEED TO POST BOND FOR TEMP POWER 2. PROVIDE TORQUE LETTER 3. HAVE UNDERSIZE BONDING CONDUCTORS FOR SECONDARY RACEWAYS -- NEC 250.66 4. PROVIDE PERFORMANCE TEST -- NEC 230.95C 5. INSTALL MAIN BONDING JUMPER -- NEC 110.3B, 250 6. PLANS CALL FOR 50K AIC MAIN BREAKER BUT THIS ONE APPEARS TO BE 35K @ 30-480 CONTRACTOR TO PROVIDE VERIFICATION VIA LETTER FROM THE ELECTRICAL ENGINEER OF RECORD FOR PROPER OVERCURRENT DEVICES THROUGHOUT -- PLANS ARE VAGUE -- NEC 110.9 7. PROVIDE ILLUMINATION FOR SERVICE -- NEC 110.26D 8. PULL HOUSE FEEDER & MAKE UP -- IDENTIFY DISCONNECTS NEC 110 WILL LOOK AT ROSS EQUIPMENT ROOM NEXT TIME |
|
02/06/2007 | ELECTRIC - CONSTRUCTION POWER | Not ready for Inspection | IVRS - Inspection :* |