Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/30/2008 | PLUMBING - FINAL | Approved | ||
| 05/27/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. CAULK ALL FIXTURES 2. POST NOTICE IN ELECTRIC SERVICE PANEL: "THIS BLDG HAS NON-METALLIC INTERIOR WATER PIPING" 3. INSTALL COUNTER SUNK TAPPED CLEANOUT PLUGS WITH MACHINE SCREWS AND LEAVE THE C.P COVERS OFF FOR INSPECTION 4. YOU MAY WISH TO CHECK YOUR T&P RELIEF DRAINS - THEY NEED TO BE GRAVITY DRAIN |
|
| 03/14/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* CONNECT YARDWATER TO METER |
|
| 03/13/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PLEASE CALL IN AND HAVE APPROVED ALL REQUIRED INSPECTIONS PRIOR TO CALLING FINAL NOTE: CLEANOUTS ARE TO BE INSTALLED WITH CLEANOUT ADAPTORS AND PLUGS. |
|
| 01/10/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |