Permit: T06CM03001

Parcel: 107120690

Inspection Status: Approved

Inspection History: PLUMBING - YARD WTR LINE/TEST

Date Description Inspector Results Comments
11/07/2007 PLUMBING - YARD WTR LINE/TEST Approved IVRS - Inspection :*
11/06/2007 PLUMBING - YARD WTR LINE/TEST Not ready for Inspection IVRS - Inspection :*
10/26/2007 PLUMBING - YARD WTR LINE/TEST Not ready for Inspection IVRS - Inspection :*
REDLINE WATER PIPING ON SITE PLAN AND HAVE SITE PLAN REVIEWED BY R. SHERRY THEN RECALL INSPECTION
02/23/2007 PLUMBING - YARD WTR LINE/TEST Partial Approval IVRS - Inspection :*
1. YARD WATER BETWEEN BUILDINGS OK TO COVER
2. SEWER @ 1% OK PER NOTE 13 P1
3. OK TO COVER SEWER BETWEEN BUILDINGS
4. RECEIVED LETTER FROM LANNING ARCHITECTURE ALLOWING PVC.
02/21/2007 PLUMBING - YARD WTR LINE/TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. PVC ROUGH SOIL W/TEST AND FOAM WRAPS OK TO COVER PENDING ACCEPTANCE OF PVC FROM ARCHITECT.
2. 2" PVC YARD WATER W/AIR TEST NOT AN ACCEPTABLE TEST METHOD REFER TO UPC
3. SEWER INSTALLED AT 1% W/TRACER WIRE NOT PER PLAN INSTALL AT 2%