Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T06CM02941
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/28/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
11/27/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* CONTRACTOR TO PAY REFEE AS STATED AT LAST INSPECTION WITHIN 5 WORKING DAYS OR PERMIT SHALL BE FROZEN. 1. SHALL SECURE ALL SHOWER & TUB VALVES CORRECTLY. 2. WATER TEST TO BE IN PLACE ON ALL UNITS. 3. WHILE YOU ARE DOWNTOWN PLEASE HAVE PLUMBING CONTRACTOR CHANGED ON THESE PERMIT TO SPARTAN PLUMBING. |
|
11/21/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* PLEASE READ ALL NOTES & COMPLY WITH CORRECTIONS ON INSPECTION DATED 11/16/06 OR YOU SHALL BE REFEED |
|
11/20/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. WORKERS SHALL NOT BE SUBJECT TO SEWER GASES DURING CONSTRUCTION -- CAP OPEN PIPES. 2. POTABLE WATER SYSTEM SHALL BE PROTECTED FROM CONTAMINATION DURING CONSTRUCTION -- INSTALL VAC BREAKERS. 3. JOINTS IN WALL SHALL BE TESTED BEFORE CONCEALMENT. 4. ONLY ONE 1/2" PIPE MAY SUPPLY ONE WASHER BOX. |
|
11/16/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* - CONTRACTOR IS SPARTAN PLUMBING - INSTALL TEMP CAPS ON OPEN DRAIN PIPING. - TEST SHOWER RISER AND TUB SPOUT OUTLETS. - INSTALL HB VAC BREAKERS OR NEW WATER HEATERS REQUIRE PERMITS AND DRAIN PANS ON SECOND FLOOR. - OK TO CONNECT DRAIN AND COVER FLOORS. - RFI WATER PIPE SIZE FOR BACK TO BACK WASHER BOX. - ONE 1/2" PIPE SERVES TWO WASHER BOXES, THIS MAY NOT BE ADEQUATE. PLAN DOES NOT SHOW SIZING FOR BOTH. |