Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/19/2006 | PLUMBING - INTERMEDIATE | Approved | ||
| 05/24/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* WATER TEST ON PIPING TO POOL FILL & HOSE BIB OK 1. VACUUM BREAKER TO HAVE TAMPER SCREW BROKE OFF. 2. CORRECT BACKFLOW PROTECTION IS REQUIRED AT CONNECTION TO BUILDING SUPPLY. TESTABLE DEVICE SUCH AS PRESSURE VACUUM BREAKER WITH CERTIFICATION. |
|
| 05/19/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE 18" MINIMUM COVER ON PLASTIC GAS PIPING. 2. PROVIDE 30" MINIMUM ON HORIZONTAL METALLIC PIPING AT RISERS. SCOTCH COATED PIPE WITH PRIMER & TAPE AT FITTINGS & TOOL MARKS. 3. GAS PIPING CANNOT RUN UNDERGROUND UNDER BUILDING OR STRUCTURE WITHOUT APPROVED SLEEVE THAT IS VENTED. 4. PROVIDE TEST ON PIPING. 5. WATER PIPING TO POOL FILL SHALL HAVE CORRECT BACKFLOW PROTECTION. HOSE BIB SHALL HAVE VACUUM BREAKER & SIGN STATING NON-POTABLE WATER DO NOT DRINK. |