Inspection History Details
Inspection Status: Partial Approval
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T06CM02902
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Partial Approval
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/10/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. COPPER PASSING THRU MASONRY TO BE PROTECTED 2. REQUIRE 18" OF COPPER BEFORE TRANSITION TO PEX AT WH. |
|
| 07/10/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* CORRECTIONS MADE OK OK TO COVER ALL AREAS |
|
| 07/05/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. PRESSURE BALANCE VALVES ON T&S COMBOS OK 2. PLUMBER WORKING ON CORRECTIONS. |
|
| 07/03/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. NO UNDERGROUND INCLUDED ON THIS PERMIT. WORK BEGAN AT INTERMEDIATE STAGE. 2. SEE NOTE #2 ABOVE. NO EXCEPTIONS! VALVES IWTH INTEGRAL STOPS ARE VALVES THAT HAVE SHUT OFFS FOR HOT & COLD BUILT INTO THE VALVE. |
|
| 06/30/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) PLAN CALLS FOR PRESSURE BALANCE WITH INDIVIDUAL CONTROL T & S VALVE 2) SECURE CLOSET FLANGES TO FLOOR 3) HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP (TRAP ARM) 4) TRAP ARM MAY NOT CHANGE SIZE AND TRAP AND TRAP ARM TO BE SAME SIZE 5) ABS IS TO BE SUPPORTED AT EACH CHANGE OF DIRECTION OR ELEVATION AND AT THE END OF BRANCHES THEN NO MORE THAN FOUR FEET BETWEEN HANGERS 6) THROUGHLY CLEAN AND REMOVE ALL RECTOR SEAL #5 FROM ABS THROUGHLY 7) WATER TEST ON ABS OK |
|
| 06/26/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) ABS DWV UNDERGROUND INSTALLED AND COVERED WITHOUT INSPECTION. I WILL NOT APPROVE INTERMEDIATE UNTIL ROUGH SOIL IS APPROVED 2) NOTE: ABS TO BE SUPPORTED AT EACH CHANGE OF DIRECTION OR ELEVATION AND AT THE END OF BRANCHES 3) T & S VALVE-NEEDS INTEGRAL STOPS 4) SUPPORT COPPER AS REQUIRED |