Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T06CM02885
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/07/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
12/06/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* CANCELLED BY CONTRACTOR |
|
12/04/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELLED |
|
11/30/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* MAKE ALL CORRECTIONS |
|
11/29/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. ALL INDIRECT DRAINAGE TO BE SUPPORTED & HAVE MINIMUM 1" AIR GAP AT INDIRECT WASTE RECEPTOR. 2. ALL APPLIANCES TO BE PROPERLY INSTALLED 3. WASH & RINSE FROM 3-COMP SINK SHALL BE SEPARATE FROM SANITIZE BOWL AND BE TRAPPED INTO GREASE TRAP PER MANUFACTURER. 4. SANITIZE BOWL OF 3-COMP SINK TO BE INDIRECT DRAINAGE TO FLOOR SINK. 5. ADD A SUPPORT ON T&P DRAIN GAS CARD AT METER. |