Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/13/2007 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 11/02/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* TIE FROM TWO CLEANOUT AT BUILDING 2' TO HCS OK |
|
| 10/22/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 09/13/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* ROUGH SOIL UNDER SLAB TEST OK |
|
| 09/04/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* PROVIDE TEST ON PIPING 1. INSTALL DRAINAGE FOR P-2 PER PLAN 2. HORIZONTAL VENTING BELOW FLOOD RIM OF FIXTURE REQUIRES LONG RADIUS DRAINAGE FITTINGS. |