Permit: T06CM02712

Parcel: 136313180

Inspection Status: Approved

Inspection History: SITE - SEWER

Date Description Inspector Results Comments
10/16/2007 SITE - SEWER Approved IVRS - Inspection :*
AIR TEST 4" SITE SEWER OK
VENTS FOR CARWASH TO 12' A.F.F WATER TEST OK
HOSE BIB OK
10/11/2007 SITE - SEWER Partial Approval IVRS - Inspection :*
CONTINUATION OF 4" SEWER FROM MANHOLE WEST TIES INTO SOUTH BRANCH BACK TO (2) BUILDING CONNECTION 3- 5' FROM BLD FOR BLD 1, CONTINUES SOUTH BRANCH TO CARWASH 5' FROM BLD, BEDDING, LAYING, TRACER OK

WILL AIR TEST AT LATER DATE
10/10/2007 SITE - SEWER Partial Approval IVRS - Inspection :*
4" SDR 35 FROM PUBLIC MANHOLE WEST APP. 60'
BEDDING, LAYING, TRACER, SHADING
10/02/2007 SITE - SEWER Partial Approval IVRS - Inspection :*
CONTINUATION OF 4" THRU INLINE CLEANOUT
TO (2) 4" BRANCHES TO CARWASH PER PLAN
10/01/2007 SITE - SEWER Not ready for Inspection IVRS - Inspection :*
RAIN CANCELLATION
09/28/2007 SITE - SEWER Partial Approval IVRS - Inspection :*
4" SDR 35 FROM 20' FROM WYE JUNCTION UPSTREAM THRU INLINE CLEANOUT & 45 DEG. APP. 40' TOWARD CARWASH

BEDDING, LAYING, TRACER, SHADING, BACKFILLING
09/27/2007 SITE - SEWER Partial Approval IVRS - Inspection :*
- 4" SDR CONTINUES NORTHEAST APP. 50' DOWNSTREAM
OF 45 DEG.
- BEDDING, LAYING, SHADING, TRACER BACKFILLING
09/26/2007 SITE - SEWER Partial Approval IVRS - Inspection :*
4" SDR 35 CONTINUOUS THRU INLINE CLEANOUT
20' PAST 45 DEG. TO NORTHEAST
COMBO CORRECTION OK
BEDDING, LAYING, TRACER, SHADING, BACKFILLING
09/25/2007 SITE - SEWER Partial Approval IVRS - Inspection :*
4" SDR 35 FROM BOTH BUILDING STUBS, BEDDING, LAYING, TRACER WIRE, DOWNSTREAM TO INITIAL, PROVIDE CORRECT COMBO, AIR TESTING OF PIPING AT LATER DATE.
08/30/2007 SITE - SEWER Partial Approval IVRS - Inspection :*
PRE-CONST. MEETING ATTENDED BY TIM - AA&K
WARREN - COBRE CONST.
PIPING TO BE INSTALLED PER PLAN WITH APPROVED DRAINAGE FITTINGS.