Permit: T06CM02712

Parcel: 136313180

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
10/18/2007 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
WATER TEST INTERCEPTOR & WATER RECOVERY TANK
PIPING THRU BUILDING WITH HCS AND INTERIOR VENTS AND DRAINS FROM MECH. ROOM
UNDERGROUND ONLY OK
08/28/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
WATER TEST ALL UNDER BUILDING INTERIOR TO STUB OUTS OF BUILDING OK
08/24/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1ST ROUGH
WATER TEST RESTROOM AREA AND P-6 OK

1. P-4 MOP SINK VENT REQUIRED TO BE LEVEL OR DRAIN BACK TO DRAINAGE


1. NORTH RESTROOM TO BE INSTALLED PER 2003 UPC REQUIREMENTS (DRAIN ARM OR DIRTY ARM TO BE INSTALLED AT INTERMEDIATE)
2. PROVIDE TEST ON GREASE WASTE DRAIN THIS DRAINAGE IS REQUIRED TO BE A DIRECT CONNECTION FOR 2-COMPARTMENTS OF 3-COMPARTMENT SINK

WATER TEST GREASE TRAP VENT OK
WATER TEST 2ND ROUGH (NORTH) OK