Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T06CM02632
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/05/2007 | BUILDING - FINAL | Approved | ||
| 01/02/2007 | BUILDING - FINAL | Denied | 1) FRAMING NOT SIGNED OFF 2) NEED 1" AIR GAP H20 SOFTNER DRAIN, AT WASHER BOX 3) COVER PLATE, RECEPTACLE AND UNDER SINK 4) EAST WALL MASTER BEDROOM, RECEPTS NOT WIRED CORRECTLY 5) TIGHTEN CONNECTIONS FLEX DISCONNECT TO FURN, SECURE DISCONNECT, CLEANUP STAT WIRE ABOVE FURN 6) ONE NEUTRAL WIRE PER LUG SCREW, SERVICE PANEL 7) LABEL PANEL NON-H20 BONDED SYSTEM 8) GRADE TO HIGH EAST SIDE YARD, REAR YARD DRAINAGE 9) MAKE SURE OVER VENT DAMPER OPENS |