Permit: T06CM02618

Parcel: 124041020

Inspection Status: Approved

Inspection History: ELECTRIC - ABOVE CEILING

Date Description Inspector Results Comments
01/09/2007 ELECTRIC - ABOVE CEILING Approved
12/13/2006 ELECTRIC - ABOVE CEILING Partial Approval IVRS - Inspection :*
LOW VOLTAGE WIRING TO BE COMPLETED
OK TO INSTALL CEILING TILES,
WILL CHECK CEILING AGAIN ON FINAL
12/12/2006 ELECTRIC - ABOVE CEILING Denied IVRS - Inspection :
The wiring is not complete or does not comply with code.| 245*
1. ALL FIXTURES NEED SUPPORT WIRES.
2. SUPPORT WIRES FOR EQUIPMENT TO BE SECURED @ BOTH ENDS - NEC 300.11
3. FILL UNUSED OPENINGS - NEC 110.12A
4. SECURE MC WITHIN 12" OF TERMINATIONS - NEC 330.30
5. USE PROPER SIZE STRAPS FOR RACEWAYS -- NEC 110.3
6. STILL HAVE OVERFILLED BOXES -- NEC 314.16 AND MAKE SURE ALL ARE GROUNDED.
7. FINISH ALL WIRING IN CEILING.

WILL HAVE FEE IF NOT CORRECT NEXT INSPECTION.
12/08/2006 ELECTRIC - ABOVE CEILING Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. NEED SUPPORT WIRES FOR ALL FIXTURES, SECURE FIXTURES TO GRID, FILL UNUSED OPENINGS -- TRACK INCLUDED.
2. HAVE OVERFILLED J-BOXES AND MAKE SURE ALL ARE GROUNDED.
3. MC TO BE STRAPPED WITHIN 12" OF TERMINATIONS AND SUPPORTED AT PROPER INTERVALS -- NEC 330

WORK ABOVE CEILING NOT COMPLETE CALL WHEN COMPLETE
AND REMOVE CEILING TILES.

GRID SUPPORT WIRES NOT TO SUPPORT OTHER EQUIPMENT NEC 300
10/27/2006 ELECTRIC - ABOVE CEILING Not ready for Inspection IVRS - Inspection :*