Permit: T06CM02601

Inspection Status: Approved

Inspection History: ELECTRIC - FINAL

Date Description Inspector Results Comments
08/14/2007 ELECTRIC - FINAL Approved IVRS - Inspection :*
08/10/2007 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
1) OK TO ENERGIZE WELLS FOR TESTING
2) 1 WIRE TERMINATION AT GROUND ROD LUGS. INSTALL 2ND GROUND LUG AT GROUND RODS
3) CANNOT TERMINATE 2 WIRES UNDER LUG IN DISCONNECT. INSTALL DBL LUG OR 2ND SINGLE LUG
4) PREVIOUS INSPECTION ITEMS CORRECTED
08/08/2007 ELECTRIC - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. CONNECT GROUNDING ELECTRODE CONDUCTOR TO DISCONNECT SERVING EACH WELL SITE -- NEC 250.32
2. GROUNDING CONDUCTORS SMALLER THAN #6 NEED TO BE INSTALLED IN RACEWAY NEC 250.64
3. COMPLETE ALL ITEMS FROM PREVIOUS INSPECTIONS
4. RECEIVED DEPTH REPORTS ON UNDERGROUND.
5. UNDERGROUND OK
08/06/2007 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
CANCELLED BY MIKE @ MOUNTAIN POWER
06/22/2007 ELECTRIC - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. CONDUCTORS OTHER THAN SERVICE CONDUCTORS SHALL NOT BE INSTALLED IN THE SAME RACEWAY -- NEC 230.7
2. NEED TO INSTALL NEUTRAL/GROUND KIT AT NEW SERVICE DISCONNECT FOR IT TO BE RATED AS SERVICE EQUIPMENT
NEC 110.3 & 230.70
3. MARK "SERVICE DISCONNECTS" NEC 230.70
4. NEED TO INSTALL NEUTRAL CONDUCTOR TO SERVICE DISCONNECTS -- NEC 250.24
5. GEC TO BE CONNECTED TO NEUTRAL - NEC 250.24
6. PVC RUN TO NEW WELL PUMPS NEVER INSPECTED FOR UNDERGROUND ELECTRICAL

FOR AFTER HOURS INSPECTION CALL JASON JAWORSKY 909-5147