Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/30/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. STILL NO TEST ON ABS 2. WHO GAVE PERMISSION TO INSULATE? NO PORTION OF ANY WORK MAY BE CONCEALED UNTIL IT HAS BEEN INSPECTED AND APPROVED. |
|
| 05/30/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* I WILL PERFORM THE INSPECTION WHEN THE JOB IS READY. THIS IS THE THIRD TIME THERE HAS BEEN NO TEST. |
|
| 05/25/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. ALL PIPING REQUIRES SUPPORT 2. HORIZONTAL ABS OVERHEAD REQUIRES SUPPORT 3. TUB WASTE - UNABLE TO TELL IF THERE IS A LEAK (TOO WET) 4. HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP. 5. SCREW CLOSET FLANGES TO FLOOR - INSTALL CORRECTLY 6. TEST ABS THRU ROOF. 7. SUPPORT TRAP AS CLOSE TO 90 DEGREES AS POSSIBLE. |