Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/03/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* NOT INSTALLED PER PLAN NO REDLINES ON SITE IS THIS POSSIBLY A MODEL PLAN? WILL NEED SITE UTILITY PLAN AT APPROPRIATE TIME. |
|
| 05/03/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1. INSTALLED PER REDLINES - NO ENGINEERING REQUIRED OK TO COVER |