Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 08/22/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* WATER TEST FROM EXISTING 4" BUILDING DRAIN THRU RESTROOM UNDERGROUND ONLY OK 1. NEED TO VIEW PIPE WRAPS. NOTE: ENGINEER TO PROVIDE INFORMTION AND DETAIL FOR TEMPERING OF HOT WATER TO PUBLIC USE LAVS TO CONFORM WITH 2003 UPC REQUIREMENTS THAT WATER HEATER TO NOT BE SOLE CONTROL OF TEMPERATURE AT PUBLIC USE LAVS. |