Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/29/2015 | ENGINEERING - FINAL | Approved | Per final on T07CM00621 | |
| 02/27/2007 | ENGINEERING - FINAL | Not ready for Inspection | THE AREA HAS BEEN SWEPT OF SOIL AND SEDIMENT. PREVIOUS CORRECTION ORDER HAS BEEN CLOSED. NOT READY FOR C OF O |
|
| 02/22/2007 | ENGINEERING - FINAL | Not ready for Inspection | MEETING WITH ARCHITECT AND BARKER MORRISEY | |
| 02/21/2007 | ENGINEERING - FINAL | Correction Required | SWEEP PARKING LOT AND DRIVEWAYS OF ALL SEDIMENT AND SOIL. RE-INSPECTIONS ON MONDAY 2-26-07, IF NOT SWEPT A NOTICE OF VIOLATION AND CITATION WILL BE ISSUED. |
|
| 02/21/2007 | ENGINEERING - FINAL | Not ready for Inspection | REVIEWED SITE WORK WITH BARKER MORRISSEY FOR PEDESTRIAN ACCESS AND HANDICAP PARKING AND RAMPS |