Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/17/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. HAND SINK FOR BAKERY PREP PER RED LINE PROVIDE APPROVED DRAWING |
|
06/28/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* AT FLORAL SINK PROVIDE 18" CLEAR IN FRONT OF 3" C.O AT 3 COMP SINK IN MEAT DEPT. POINT OF VENT CANNOT BE BELOW WEIR OF TRAP PROVIDE COPIES OF BACKFLOW CERTS. IDENTIFY EQUIPMENT SEVERED |
|
06/15/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
05/21/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
05/08/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* DELI/BAKERY ROUGH AND INTERMEDIATE PLUMBING, OK TO COVER WALLS & FLOOR |
|
05/07/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
04/27/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* INTERMEDIATE AT SUSHI OK TO COVER WALLS AFTER SAFETY PLATES. FS NOT SHOWN ON SCHEMATIC DRAWING. REDLINE THIS ON PLAN. PROVIDE LETTER OR PLAN REVISION TO CLARIFY USE OF 3-COMP SINK. |
|
04/04/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* DRAIN PIPING REPAIR AT PHARMACY SINK OK |
|
03/14/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
02/07/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
01/30/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
01/09/2007 | PLUMBING - INTERMEDIATE | Partial Approval | ||
12/28/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) WATER HEATER DRAIN AT PRODUCE AREA IS OK 2) PROVIDE PLUMBING SPECS, THIS WILL INCLUDE PIPING MATERIAL AND INSULATION TYPES |
|
12/27/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* WATER PIPING IN PRODUCE PREP OK 1. SHALL PROVIDE DIRECT DRAIN CONNECTION FOR DISPOSAL 2. SHALL PROVIDE PAN DRAIN FOR WATER HEATER NOTE: DISPOSER DRAINAGE IS REQUIRED TO BE DIRECT DRAINAGE CONNECTION TO SANITARY SEWER PLAN APPROVED IN ERROR. |
|
11/22/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) IT DOES NOT APPEAR THAT CHIPPING OUT A SMALL NOTCH IN CONCRETE WOULD HARM THE BLDG NOR WOULD IT REQUIRE EXCESSIVE LABOR 2) USE CONVENTIONAL VENTING AS DRAWN, UNLESS STRUCTURAL CONDITIONS PREVENT IT 3) FOR CHANGES TO GEASE WASTE, YOU WILL NEED RED LINE CHANGES PRIOR TO INSPECTION AND A PLAN REVISION WILL BE REQUIRED FOR FINAL APPROVAL |
|